How To Fix /PLMI/GSS_SI2B006 - Base quantity and unit incomplete for routing-MatBOM assignment &1


/PLMI/GSS_SI2B006 - Overview

  • Message type: E = Error

  • Message class: /PLMI/GSS_SI2B -

  • Message number: 006

  • Message text: Base quantity and unit incomplete for routing-MatBOM assignment &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PLMI/GSS_SI2B006 - Base quantity and unit incomplete for routing-MatBOM assignment &1 ?
    The SAP error message /PLMI/GSS_SI2B006 indicates that there is an issue with the base quantity and unit of measure for a routing and material BOM (Bill of Materials) assignment. This error typically arises when the system expects certain data to be present for the routing and BOM assignment, but it is missing or incomplete.
    
    Cause: Incomplete Data: The base quantity or unit of measure for the routing or material BOM assignment is not defined or is incomplete.
    Configuration Issues: There may be configuration issues in the material master or routing that prevent the system from correctly linking the two. Missing Entries: The relevant entries in the routing or BOM may not have been created or may have been deleted. Data Inconsistency: There could be inconsistencies in the data between the routing and the BOM.
    Solution: Check Material Master: Ensure that the material master data is complete, especially the base quantity and unit of measure fields. Review Routing: Verify

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker