Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/ECR_BO -
Message number: 082
Message text: You cannot use both date and parameter effectivity to create a change no.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/ECR_BO082
- You cannot use both date and parameter effectivity to create a change no. ?The SAP error message
/PLMI/ECR_BO082
indicates that there is a conflict in the way you are trying to create a change number in the system. Specifically, it states that you cannot use both date and parameter effectivity simultaneously when creating a change number. This typically occurs in the context of Engineering Change Management (ECM) within SAP.Cause:
The error arises when you attempt to specify both a date and a parameter effectivity for the same change number. In SAP, effectivity can be defined in two ways:
- Date Effectivity: This is based on specific dates (e.g., valid from and valid to dates).
- Parameter Effectivity: This is based on specific parameters or conditions that determine the validity of the change.
Using both methods at the same time is not allowed, as it creates ambiguity in how the change should be applied.
Solution:
To resolve this error, you need to choose one method of effectivity for your change number creation. Here are the steps you can take:
Decide on Effectivity Type: Determine whether you want to use date effectivity or parameter effectivity for your change number.
Adjust Your Input:
- If you choose Date Effectivity, ensure that you only provide the date fields (e.g., valid from and valid to) and do not include any parameter effectivity settings.
- If you choose Parameter Effectivity, ensure that you only provide the necessary parameters and do not include any date fields.
Recreate the Change Number: After adjusting your input based on the chosen effectivity type, attempt to create the change number again.
Related Information:
CC01
(Create Change Master) or CC02
(Change Change Master) to manage change numbers effectively.If the issue persists after following these steps, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/ECR_BO081
You are not authorized to access all scope items
What causes this issue? You do not have sufficient authorization to change or display all scope items. Atleast one scope item is not available in the...
/PLMI/ECR_BO080
Key '&1' at change item &2 is not within the range allowed in Customizing
What causes this issue? The value entered on the screen is different from the value range specified for that field in the Customizing. For more infor...
/PLMI/ECR_BO083
Create mapping in Customizing for change number handling at header level
What causes this issue? You have not maintained any mapping.How to fix this error? Create the mapping for a change number creation at the engineerin...
/PLMI/ECR_BO084
Create mapping in Customizing for change number handling at item level
What causes this issue? You have not specified any mapping.,,,,How to fix this error? Create mapping for a change number creation at the engineering...
Click on this link to search all SAP messages.