How To Fix /PLMB/BA_ACE251 - End of date/time is before start of date/time


/PLMB/BA_ACE251 - Overview

  • Message type: E = Error

  • Message class: /PLMB/BA_ACE -

  • Message number: 251

  • Message text: End of date/time is before start of date/time

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/PLMB/BA_ACE251 - Details

  • The SAP error message /PLMB/BA_ACE251 indicating "End of date/time is before start of date/time" typically occurs in scenarios where a date or time range is being defined, and the end date/time is set to a value that is earlier than the start date/time. This can happen in various contexts, such as planning, scheduling, or data entry.
    
    Cause: Incorrect Date/Time Input: The most common cause is that the user has mistakenly entered the end date/time as being earlier than the start date/time. Data Entry Errors: Manual data entry errors can lead to this issue, especially if the dates are entered in a non-standard format or if there is confusion between AM/PM or 24-hour formats. System Configuration: In some cases, system settings or configurations may lead to unexpected behavior in date/time handling.
    Solution: Check Input Values: Review the date and time values you have entered. Ensure that the end date/time is indeed later than the start date/time. Correct Format:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/PLMB/BA_ACE251 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant