How To Fix PLM_SE_PRS_MESSAGES073 - Parent WBS element has to be the same for a network and its subnetworks.


PLM_SE_PRS_MESSAGES073 - Overview

  • Message type: E = Error

  • Message class: PLM_SE_PRS_MESSAGES - Message class for PS services

  • Message number: 073

  • Message text: Parent WBS element has to be the same for a network and its subnetworks.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PLM_SE_PRS_MESSAGES073 - Parent WBS element has to be the same for a network and its subnetworks. ?
    The SAP error message PLM_SE_PRS_MESSAGES073 indicates that there is a mismatch in the Work Breakdown Structure (WBS) elements between a network and its associated subnetworks. Specifically, this error occurs when the parent WBS element of a network does not match the parent WBS element of its subnetworks.
    
    Cause: WBS Element Mismatch: The primary cause of this error is that the network (or project) is linked to a different parent WBS element than its subnetworks. In SAP, all subnetworks must share the same parent WBS element as their parent network. Incorrect Configuration: This can happen due to incorrect configuration or manual entry errors when creating or modifying networks and subnetworks. Data Integrity Issues: If there have been changes in the project structure or if data has been imported incorrectly, it can lead to inconsistencies in the WBS hierarchy.
    Solution: To resolve this error, you can follow these steps: Check WBS Elements: Go to the network in question and check

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker