Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix PLM_SE_PRS_MESSAGES028 - Material component already assigned to the activity.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PLM_SE_PRS_MESSAGES - Message class for PS services

  • Message number: 028

  • Message text: Material component already assigned to the activity.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PLM_SE_PRS_MESSAGES028 - Material component already assigned to the activity. ?

    The SAP error message PLM_SE_PRS_MESSAGES028 indicates that a material component is already assigned to an activity in the Project System (PS) or Product Lifecycle Management (PLM) module. This typically occurs when you attempt to assign a material that is already linked to another activity or when there is an attempt to duplicate the assignment.

    Cause:

    1. Duplicate Assignment: The material component you are trying to assign is already linked to another activity within the same project or task.
    2. Incorrect Activity Status: The activity may be in a status that does not allow for changes or additional assignments.
    3. Configuration Issues: There may be configuration settings in the system that prevent multiple assignments of the same material to different activities.

    Solution:

    1. Check Existing Assignments:

      • Navigate to the project or activity in question and check the list of assigned materials/components. Ensure that the material you are trying to assign is not already listed.
    2. Remove Existing Assignment:

      • If the material is already assigned and you need to reassign it, you may need to remove it from the current activity before assigning it to a new one.
    3. Review Activity Status:

      • Ensure that the activity is in a status that allows for changes. If the activity is locked or completed, you may need to change its status to allow for modifications.
    4. Consult Documentation:

      • Review SAP documentation or help files related to project management and material assignments for any specific guidelines or restrictions.
    5. Check Configuration:

      • If you have access, check the configuration settings in the Project System to see if there are any restrictions on material assignments that need to be adjusted.
    6. Contact Support:

      • If the issue persists and you cannot resolve it, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CJ02 (Change Project) to manage project assignments.
    • SAP Notes: Look for SAP Notes related to PLM and Project System for any known issues or patches that might address this error.
    • User Roles and Permissions: Ensure that you have the necessary permissions to make changes to project assignments, as restrictions may lead to errors.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker