How To Fix PLM_SE_PRS_MESSAGES028 - Material component already assigned to the activity.


PLM_SE_PRS_MESSAGES028 - Overview

  • Message type: E = Error

  • Message class: PLM_SE_PRS_MESSAGES - Message class for PS services

  • Message number: 028

  • Message text: Material component already assigned to the activity.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PLM_SE_PRS_MESSAGES028 - Material component already assigned to the activity. ?
    The SAP error message PLM_SE_PRS_MESSAGES028 indicates that a material component is already assigned to an activity in the Project System (PS) or Product Lifecycle Management (PLM) module. This typically occurs when you attempt to assign a material that is already linked to another activity or when there is an attempt to duplicate the assignment.
    
    Cause: Duplicate Assignment: The material component you are trying to assign is already linked to another activity within the same project or task. Incorrect Activity Status: The activity may be in a status that does not allow for changes or additional assignments.
    Configuration Issues: There may be configuration settings in the system that prevent multiple assignments of the same material to different activities.
    Solution: Check Existing Assignments: Navigate to the project or activity in question and check the list of assigned materials/components. Ensure that the material you are trying to assign is not already listed. Remove Existing Assignment: If the material is already

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant