How To Fix PLM_PTU_N007 - Total time greater than permitted limit: &1


PLM_PTU_N007 - Overview

  • Message type: E = Error

  • Message class: PLM_PTU_N - Messages for PTU Message Handler

  • Message number: 007

  • Message text: Total time greater than permitted limit: &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PLM_PTU_N007 - Total time greater than permitted limit: &1 ?
    The SAP error message PLM_PTU_N007 indicates that the total time entered for a particular process or task exceeds the permitted limit defined in the system. This error is commonly encountered in the context of Project Management or Product Lifecycle Management (PLM) modules, where time tracking is crucial for project planning and execution.
    
    Cause: The error is triggered when the total time recorded for a task, project, or activity surpasses the maximum allowable limit set in the system configuration. This limit could be defined based on business rules, project constraints, or system settings.
    Solution: To resolve the PLM_PTU_N007 error, you can take the following steps: Review Time Entries: Check the time entries associated with the task or project. Ensure that the total time recorded does not exceed the allowed limit. Adjust Time Entries: If the total time exceeds the limit, you may need to adjust the time entries. This could involve: Reducing the time recorded for specific activities. Splitting

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker