Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 711
Message text: &1 of control cycles with status 'In Prep.' checked still inconsistent
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PK711
- &1 of control cycles with status 'In Prep.' checked still inconsistent ?The SAP error message PK711 indicates that there are control cycles in the system that are marked as "In Preparation" but are still inconsistent. This typically occurs in the context of Production Planning (PP) and Costing, particularly when dealing with the configuration of control cycles for product costing.
Cause: The inconsistency can arise from several factors, including: Incomplete Configuration: The control cycle may not be fully configured, meaning that some required fields or settings are missing. Data Inconsistencies: There may be inconsistencies in the master data related to the materials or production processes involved in the control cycle. Locked Objects: Sometimes, objects related to the control cycle may be locked, preventing the system from processing them correctly. Changes in Master Data: If there have been recent changes to the master data (like BOMs, routings, or work centers) that are not reflected in the control cycle, this can lead to inconsistencies. Status Issues: The control cycle may be
Get instant SAP help. Sign up for our Free Essentials Plan.
PK710
&1 of &2 control cycles checked manifest serious inconsistencies
What causes this issue? Inconsistencies have been detected in the relevant control cycles. Because the status of the control cycle is not "In Cr...
PK709
Number of kanban containers to be created must be at least one
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK712
&1 of changed control cycles checked can be saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK713
Consistency check of &1 control cycles resulted in no errors
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.