How To Fix PK601 - Current date &1 is used to determine the control cycle proposals


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PK - Production - KANBAN

  • Message number: 601

  • Message text: Current date &1 is used to determine the control cycle proposals

  • Show details Hide details
  • What causes this issue?

    The parameter validity in the iPPE has not been activated or no date has
    been saved.

    System Response

    The current date (user time zone) is used to calculate the control cycle
    proposals.

    How to fix this error?

    If you want to work with another date, choose <LS>Filter -> Parameter
    Effectivity</> in the iPPE workbench and enter another date.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PK601 - Current date &1 is used to determine the control cycle proposals ?

    The SAP error message PK601 indicates that the current date being used to determine control cycle proposals is not valid or is causing an issue in the context of the planning process. This error typically arises in the context of production planning and control (PP) when the system is trying to generate proposals for control cycles based on the current date.

    Cause:

    1. Invalid Date: The current date may not be valid for the control cycle proposals due to various reasons, such as:

      • The date is outside the planning horizon.
      • The control cycle is not active or has not been set up correctly for the current date.
      • The control cycle is not defined for the material or plant combination being used.
    2. Configuration Issues: There may be configuration issues in the planning settings or control cycle settings that prevent the system from generating proposals.

    3. Master Data Issues: Missing or incorrect master data related to materials, control cycles, or planning parameters can also lead to this error.

    Solution:

    1. Check Control Cycle Configuration:

      • Verify that the control cycle is correctly configured and active for the relevant materials and plants.
      • Ensure that the control cycle is set up for the correct planning period.
    2. Review Current Date:

      • Check if the current date is within the valid planning horizon for the control cycle.
      • If necessary, adjust the date or planning parameters to ensure they align with the control cycle settings.
    3. Master Data Verification:

      • Ensure that all relevant master data (material master, control cycle master, etc.) is correctly maintained and up to date.
      • Check for any missing entries or incorrect settings that could affect the control cycle proposals.
    4. Consult Documentation:

      • Review SAP documentation or help resources related to control cycles and planning to ensure that all necessary steps have been followed.
    5. System Logs and Traces:

      • Check system logs or traces for additional error messages or warnings that may provide more context about the issue.
    6. SAP Notes:

      • Search for relevant SAP Notes that may address this specific error or provide patches or updates that could resolve the issue.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like MD04 (Stock/Requirements List) or MD61 (Create Planned Independent Requirements) to analyze the planning situation.
    • Control Cycle Maintenance: Use transaction PK01 to create or maintain control cycles.
    • Planning Parameters: Review planning parameters in transaction OM17 or similar to ensure they are set correctly.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP PP module for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant