How To Fix PK592 - 'Consider Nonworking Days' indicator has no effect in sub-day scheduling


PK592 - Overview

  • Message type: E = Error

  • Message class: PK - Production - KANBAN

  • Message number: 592

  • Message text: 'Consider Nonworking Days' indicator has no effect in sub-day scheduling

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PK592 - 'Consider Nonworking Days' indicator has no effect in sub-day scheduling ?
    The SAP error message PK592, which states that the "Consider Nonworking Days" indicator has no effect in sub-day scheduling, typically arises in the context of production planning and scheduling within SAP. This message indicates that the system is unable to apply nonworking days when scheduling at a sub-day level (e.g., hours or minutes) because the nonworking days are generally defined at a daily level.
    
    Cause: Sub-Day Scheduling: The error occurs because the scheduling is being done at a granularity that does not allow for the consideration of nonworking days. Nonworking days are usually defined in the calendar at a daily level, and when scheduling is done in smaller increments (like hours or minutes), the system cannot apply these nonworking days effectively. Configuration Settings: The configuration of the scheduling parameters may not be set up to handle nonworking days in conjunction with sub-day scheduling. Calendar Settings: The factory calendar or work schedule may not be

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author