How To Fix PK506 - Requirement was due on &1 at &2


PK506 - Overview

  • Message type: E = Error

  • Message class: PK - Production - KANBAN

  • Message number: 506

  • Message text: Requirement was due on &1 at &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PK506 - Requirement was due on &1 at &2 ?
    The SAP error message PK506 ("Requirement was due on &1 at &2") typically occurs in the context of production planning and control, particularly when dealing with material requirements planning (MRP) and production orders. This message indicates that there is a requirement for a material that was due at a specific date and time, but it has not been fulfilled or processed in time.
    
    Cause: Delayed Production Orders: The production order for the required material was not completed on time. Material Shortages: There may be a shortage of the required materials needed to fulfill the production order. Scheduling Issues: The scheduling of production or procurement may not align with the requirement dates. Incorrect Planning Parameters: MRP settings or planning parameters may not be configured correctly, leading to unrealistic scheduling. Lead Time Issues: The lead times for procurement or production may not have been accurately defined, causing delays.
    Solution: Check Production Orders: Review the status of the production orders related

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author