Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 502
Message text: Enter a valid control cycle category
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PK502
- Enter a valid control cycle category ?The SAP error message PK502, which states "Enter a valid control cycle category," typically occurs in the context of Production Planning (PP) or Production Planning for Process Industries (PP-PI) when a user is trying to create or modify a control cycle in the system. This error indicates that the system requires a valid control cycle category to proceed.
Cause: Invalid Input: The user may have entered an invalid or non-existent control cycle category in the relevant field.
Configuration Issues: The control cycle categories may not be properly configured in the system, or the necessary settings may be missing. Authorization Issues: The user may not have the necessary authorizations to access or create control cycles for the specified category.
Solution: Check Input: Ensure that the control cycle category entered is valid. You can refer to the documentation or configuration settings to verify the correct categories. Configuration Check: Go to the configuration settings in SAP (Transaction SPRO) and navigate
Get instant SAP help. Sign up for our Free Essentials Plan.
PK501
Posting error (table &1, sy-subrc &2, sy-dbcnt &3, plnd-display &4)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK500
Trigger point of control cycle &1, &2, &3 can only be changed to &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK503
Enter a valid replenishment strategy
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK504
Maximum number of empty kanban containers exceeded in control cycle &1
What causes this issue? In control cycle maintenance, you can determine the maximum permitted number of empty kanban containers in the control cycle....
Click on this link to search all SAP messages.