Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 225
Message text: Calculated cntrl cycles: &1 / cntrl cycles not calculated: &2 (see log)
The kanban calculation has been completed.
For &V1& control cycles, the system created a change proposal which you
can check and accept using the transaction 'Kanban calculation - check
and accept'.
For &V2& control cycles, the system could not create a change proposal
as errors occurred in the calculation. You can evaluate these errors
using the transaction 'Kanban calculation - display error log'.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PK225
- Calculated cntrl cycles: &1 / cntrl cycles not calculated: &2 (see log) ?The SAP error message PK225 indicates an issue with the calculation of control cycles in the context of production planning and control (PP) or related modules. This message typically arises during the execution of a process that involves control cycles, such as the creation or processing of production orders, planning runs, or similar activities.
Cause: The error message PK225 is triggered when the system encounters a problem while calculating control cycles. The message provides two key pieces of information: Calculated control cycles: &1: This indicates the number of control cycles that were successfully calculated. Control cycles not calculated: &2: This indicates the number of control cycles that could not be calculated due to various reasons. Common causes for this error include: Missing Master Data: Required master data (like material master, work center, or routing) may be incomplete or missing.
Configuration Issues: There may be issues with the configuration of the control cycle itself, such as incorrect settings
Get instant SAP help. Sign up for our Free Essentials Plan.
PK224
Enter the scenario
What causes this issue? You want to carry out the kanban calculation on the basis of simulative requirements from long-term planning. To be able to d...
PK223
Existing schedule line is still active
What causes this issue? You want to trigger replenishment for a kanban again. However, an open schedule line still exists for this kanban.System Resp...
PK226
No kanban containers exist for the control cycle
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK227
Control cycle &1 not calculated as RLT of mat. &2 has not been maintained
What causes this issue? The system could not carry out the calculation for control cycle &V1& as no replenishment lead time could be determin...
Click on this link to search all SAP messages.