Do you have any question about this error?
Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 129
Message text: Replenishment lead time in days is not possible
A replenishment time in working days cannot be entered for event-driven
control cycles.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PK129
- Replenishment lead time in days is not possible ?The SAP error message PK129, which states "Replenishment lead time in days is not possible," typically occurs in the context of inventory management and material planning. This error indicates that the system has encountered an issue with the replenishment lead time defined for a material or product in the system.
Cause:
- Invalid Lead Time Configuration: The replenishment lead time may be set to a negative value or a value that exceeds the maximum allowed limit.
- Material Master Data Issues: The material master data may not be correctly configured, leading to inconsistencies in the lead time settings.
- Planning Parameters: The planning parameters for the material may not be set correctly, causing the system to reject the lead time.
- Supply Chain Constraints: There may be constraints in the supply chain that make the specified lead time unachievable.
Solution:
Check Material Master Data:
- Go to the material master record (transaction code MM03) and verify the replenishment lead time settings.
- Ensure that the lead time is set to a valid positive number.
Review Planning Parameters:
- Check the planning parameters for the material in the material master (transaction code MM02).
- Ensure that the settings for the planning strategy, lot size, and other relevant parameters are correctly configured.
Adjust Replenishment Lead Time:
- If the lead time is set incorrectly, adjust it to a realistic value that reflects the actual time required for replenishment.
Consult with Supply Chain Team:
- If there are supply chain constraints affecting the lead time, consult with the supply chain or logistics team to understand the limitations and adjust the lead time accordingly.
Run MRP (Material Requirements Planning):
- After making changes, run the MRP process again to see if the error persists.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional insights.
Get instant SAP help. Start your 7-day free trial now.
PK128
No safety factor possible for event-driven control cycle
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK127
Calculation profile cannot be set
What causes this issue? A calculation profile cannot be entered for event-driven control cycles if the <ZK>Sub-Day Forward Scheduling</> ...
PK130
No sub-day replenishment lead time possible
What causes this issue? A replenishment time in hours or minutes cannot be entered for event-driven control cycles if the <ZK>Sub-Day Forward S...
PK131
Not possible to maintain constants for kanban calculation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.