How To Fix PK049 - Control cycle data must be saved first


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PK - Production - KANBAN

  • Message number: 049

  • Message text: Control cycle data must be saved first

  • Show details Hide details
  • What causes this issue?

    The number of the control cycle is not determined until you save.
    Therefore, you can no longer print the kanban.

    System Response

    The print command is flagged. When you save, the system will print the
    kanban.

    How to fix this error?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PK049 - Control cycle data must be saved first ?

    The SAP error message PK049, which states "Control cycle data must be saved first," typically occurs in the context of Production Planning (PP) and is related to the control cycle configuration in SAP. This error indicates that you are trying to perform an action that requires the control cycle data to be saved before proceeding.

    Cause:

    1. Unsaved Changes: You may have made changes to the control cycle data but have not saved them yet. The system requires that all changes be saved before you can perform further actions.
    2. Incomplete Data: The control cycle may not be fully configured or may have missing mandatory fields that need to be completed before saving.
    3. Transaction Sequence: You might be trying to execute a transaction that depends on the control cycle being saved, but the system has not yet registered the changes.

    Solution:

    1. Save the Control Cycle: Ensure that you save the control cycle data before attempting to perform any further actions. Look for a "Save" button or option in the interface you are using.
    2. Check for Errors: If you are unable to save, check for any error messages or warnings that may indicate missing or incorrect data. Correct any issues and try saving again.
    3. Complete Required Fields: Make sure all mandatory fields in the control cycle configuration are filled out correctly. This includes fields like control cycle type, material, and other relevant parameters.
    4. Review Transaction Steps: If you are following a specific sequence of transactions, ensure that you are following the correct order. Some actions may require prior steps to be completed and saved.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as PK01 (Create Control Cycle), PK02 (Change Control Cycle), and PK03 (Display Control Cycle) to manage control cycles effectively.
    • Documentation: Refer to SAP documentation or help files for detailed information on control cycles and their configuration.
    • User Permissions: Ensure that you have the necessary permissions to save changes to control cycles. If you lack the required authorizations, contact your SAP administrator.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues or bugs related to control cycles and the PK049 error.

    By following these steps, you should be able to resolve the PK049 error and successfully save your control cycle data.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author