Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 046
Message text: Control cycle &1 was not calculated. Selection criteria produced 0 reqmts
Control cycle &V1& was not calculated as no requirements exist in the
evaluation period selected or for the requirements type you selected.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PK046
- Control cycle &1 was not calculated. Selection criteria produced 0 reqmts ?The SAP error message PK046 indicates that the control cycle specified in the message was not calculated because the selection criteria resulted in zero requirements. This typically occurs in the context of Production Planning (PP) and can be related to various factors. Here’s a breakdown of the potential causes, solutions, and related information:
Causes:
- No Valid Control Cycle: The control cycle may not be properly defined or may not exist for the specified material or plant.
- Selection Criteria: The selection criteria used for the calculation may be too restrictive, leading to no requirements being found.
- Material Master Data Issues: The material may not have the necessary master data set up correctly, such as MRP type, lot size, or planning parameters.
- No Demand: There may be no demand for the material, meaning there are no planned orders, sales orders, or forecasts that would generate requirements.
- Incorrect Planning Version: The planning version being used may not have any active requirements or may not be set up correctly.
- Date Issues: The date range specified for the calculation may not include any relevant requirements.
Solutions:
- Check Control Cycle Definition: Verify that the control cycle is correctly defined for the material and plant in question. Ensure that all necessary parameters are set.
- Review Selection Criteria: Adjust the selection criteria to be less restrictive. This may involve changing the date range or other parameters to ensure that requirements can be found.
- Validate Material Master Data: Check the material master data for the relevant material. Ensure that MRP settings, lot sizes, and other planning parameters are correctly configured.
- Check for Demand: Ensure that there are active demands for the material, such as sales orders, production orders, or forecasts. If there are none, consider creating them to generate requirements.
- Use Correct Planning Version: Make sure you are using the correct planning version that contains the necessary data for the calculation.
- Adjust Date Range: If applicable, modify the date range for the calculation to include periods where requirements may exist.
Related Information:
By following these steps, you should be able to identify the root cause of the PK046 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PK045
Control cycle has already been created by another user
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK044
Data blocked by another user
What causes this issue? A lock requested by the application program for the data that you want to process cannot be given as anther SAP transaction i...
PK047
Position cursor on a kanban
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...