Do you have any question about this error?
Message type: E = Error
Message class: PJ - MPX interface messages (Download and Upload)
Message number: 040
Message text: Internal error when reading calendar &
The factory calendar you want to download to Microsoft Project (R)
could not be found. During referencing, an internal error occurred.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
INCLUDE 'NA_ALLG_SYSTEMVERW' OBJECT DOKU ID TX
Error message extract from SAP system. Copyright SAP SE.
PJ040
- Internal error when reading calendar & ?The SAP error message PJ040, which states "Internal error when reading calendar," typically occurs in the context of project management or when dealing with project-related data in SAP. This error can arise due to various reasons, including issues with the project calendar configuration, inconsistencies in the data, or problems with the underlying database.
Causes:
- Calendar Configuration Issues: The project calendar may not be set up correctly, or there may be inconsistencies in the calendar settings.
- Data Inconsistencies: There could be inconsistencies in the project data, such as missing or incorrect entries related to the calendar.
- Database Issues: Problems with the database, such as corruption or connectivity issues, can lead to internal errors.
- Authorization Issues: Lack of proper authorizations to access certain project data or calendar settings can also trigger this error.
- System Bugs: Occasionally, this error may be due to bugs in the SAP system or specific versions of the software.
Solutions:
Check Calendar Configuration:
- Verify the project calendar settings in the project definition. Ensure that the calendar is correctly assigned and configured.
- Check if the calendar is active and has the correct working days and holidays defined.
Data Consistency Check:
- Run consistency checks on the project data to identify any discrepancies. Use transaction codes like
CJ20N
(Project Builder) to review the project structure and data.- Look for any missing or incorrect entries related to the project calendar.
Database Integrity:
- If you suspect database issues, consult your SAP Basis team to check for database integrity and perform necessary repairs or optimizations.
Authorization Check:
- Ensure that the user encountering the error has the necessary authorizations to access the project and its calendar settings.
SAP Notes and Support:
- Check the SAP Support Portal for any relevant SAP Notes that may address this specific error. There may be patches or updates available that resolve known issues.
- If the problem persists, consider reaching out to SAP Support for further assistance.
System Logs:
- Review system logs (transaction
SM21
) for any additional error messages or warnings that could provide more context about the issue.Related Information:
CJ20N
(Project Builder), CJ01
(Create Work Breakdown Structure), and CJ02
(Change Work Breakdown Structure) for managing project data.By following these steps, you should be able to diagnose and resolve the PJ040 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
PJ030
Unit & not allowed (only time units allowed)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PJ010
You cannot download all the factory calendars
What causes this issue? The number of factory calendars for downloading to Microsoft Project (R)is too large. The maximum number of calendars that ca...
PJ050
You cannot download all calendar exceptions
What causes this issue? The number of calendar exceptions for downloading to Microsoft Project (R)is too large. The maximum number of calendar except...
PJ060
Internal error when determining a work center
What causes this issue? An internal error occurred when determining work centers to be downloaded to Microsoft Project (R).System Response INCLUDE &...
Click on this link to search all SAP messages.