How To Fix PIC01207 - Material &1 is a non-leading part in plant &2, MRP area &3, Use &4


PIC01207 - Overview

  • Message type: E = Error

  • Message class: PIC01 - Parts Interchangeability Message Class

  • Message number: 207

  • Message text: Material &1 is a non-leading part in plant &2, MRP area &3, Use &4

  • Show details Hide details
  • What causes this issue?

    Material &V1& is indicated as being interchangeable within planning-
    relevant processes such as the MRP run or the planning allocation. This
    means that it is either a member of a MPN MRP-set or a supersession
    chain. Some online processes require the entry of the leading part
    within a MPN MRP-set or a supersession chain, to enable the processing.
    Included in this are the planning runs or the total requirements
    display. The "leading part" of a supersession chain is always the first
    grouping of the chain. Material &V1& is in plant &V2&, MRP area &V3& a
    non-leading material.

    System Response

    The processing is terminated.

    How to fix this error?

    Use material &V4& in the same plant/MRP area.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PIC01207 - Material &1 is a non-leading part in plant &2, MRP area &3, Use &4 ?
    The SAP error message PIC01207 indicates that the material specified is a non-leading part in the specified plant and MRP area. This typically occurs in the context of Material Requirements Planning (MRP) when the system is trying to process a material that is not set up as a leading part in the given context.
    
    Cause: Non-Leading Part: The material is defined as a non-leading part in the specified plant and MRP area. Non-leading parts are typically used for specific purposes, such as components in a bill of materials (BOM) or for certain planning scenarios. MRP Area Configuration: The MRP area may not be configured to handle non-leading parts correctly, or the material may not be assigned to the correct MRP area. Planning Parameters: The planning parameters for the material may not be set up correctly, leading to issues during the MRP run.
    Solution: Check Material Master Data: Review the material master data for the specified material.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker