How To Fix PFM_EA_PS048 - Program/Measure &1/&2 are not valid in the period between &3 and &4


PFM_EA_PS048 - Overview

  • Message type: E = Error

  • Message class: PFM_EA_PS -

  • Message number: 048

  • Message text: Program/Measure &1/&2 are not valid in the period between &3 and &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PFM_EA_PS048 - Program/Measure &1/&2 are not valid in the period between &3 and &4 ?
    The SAP error message PFM_EA_PS048 indicates that there is an issue with the validity of a program or measure within a specified time period. This error typically arises in the context of project management or financial planning when trying to access or manipulate data related to a program or measure that is not valid for the given date range.
    
    Cause: Invalid Program/Measure: The specified program or measure (&1/&2) is not valid for the period defined by the dates (&3 to &4). This could be due to: The program or measure not being activated for that time frame. The program or measure being closed or archived. The program or measure being incorrectly configured in the system. Date Range Issues: The date range specified may not align with the validity periods defined for the program or measure in the system. Configuration Errors: There may be configuration issues in the system that prevent the program or measure from being recognized

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker