Message type: E = Error
Message class: /PF1/MSG_RP_E -
Message number: 889
Message text: Specify the base time for calculating the planned execution time
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PF1/MSG_RP_E889
- Specify the base time for calculating the planned execution time ?The SAP error message
/PF1/MSG_RP_E889
indicates that the system requires a base time to calculate the planned execution time for a specific operation or task. This error typically arises in the context of production planning or scheduling within SAP, where the system needs a reference point to determine how long a task is expected to take.Cause:
The error is usually caused by one of the following reasons:
- Missing Base Time: The base time for the operation or task has not been defined in the relevant master data (e.g., routing, work center).
- Incorrect Configuration: The configuration settings for the planning or scheduling process may not be set up correctly, leading to the absence of a base time.
- Data Inconsistency: There may be inconsistencies in the data related to the production order, routing, or work center that prevent the system from calculating the planned execution time.
Solution:
To resolve this error, you can take the following steps:
Check Master Data:
- Go to the relevant routing or work center in SAP and ensure that the base time is defined correctly.
- For routings, check the operation details to ensure that the base time is specified.
- For work centers, verify that the standard values (e.g., setup time, processing time) are maintained.
Maintain Base Time:
- If the base time is missing, you will need to enter it. This can typically be done in the transaction codes:
- CA01 (Create Routing)
- CA02 (Change Routing)
- CR01 (Create Work Center)
- CR02 (Change Work Center)
Review Configuration:
- Check the configuration settings in the SAP system related to production planning and scheduling. Ensure that all necessary parameters are set up correctly.
Data Consistency Check:
- Run consistency checks on the relevant master data to identify any discrepancies that may be causing the issue.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on how to set up base times and related parameters.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By following these steps, you should be able to resolve the error and ensure that the planned execution time can be calculated correctly.
Get instant SAP help. Start your 7-day free trial now.
/PF1/MSG_RP_E888
Time unit for calculating the planned execution time is not valid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/MSG_RP_E887
Specify the time unit for calculating the planned execution time
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/MSG_RP_E890
Base time for calculating the planned execution time is not valid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/MSG_RP_E891
Specify the +/- sign for calculating the planned execution time
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.