Do you have any question about this error?
Message type: E = Error
Message class: PEP - Schedule Manager: Messages
Message number: 259
Message text: Scheduling was terminated
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PEP259
- Scheduling was terminated ?The SAP error message PEP259, which states "Scheduling was terminated," typically occurs in the context of project management and scheduling within SAP, particularly when dealing with Project System (PS) or Production Planning (PP) modules. This error indicates that the scheduling process for a project or production order could not be completed successfully.
Causes of PEP259 Error
Missing or Incorrect Data: Required data for scheduling may be missing or incorrectly entered. This can include missing dates, resources, or dependencies.
Resource Availability: The resources required for the scheduled tasks may not be available, leading to a failure in scheduling.
Conflicts in Scheduling: There may be conflicts in the scheduling parameters, such as overlapping tasks or constraints that cannot be resolved.
System Configuration Issues: Incorrect configuration settings in the project or production planning modules can lead to scheduling errors.
Locked Objects: If the project or order is locked by another user or process, it may prevent scheduling from being completed.
Status of the Project/Order: The project or order may be in a status that does not allow for scheduling (e.g., closed or completed).
Solutions to PEP259 Error
Check Data Completeness: Review the project or order data to ensure all required fields are filled out correctly. Look for missing dates, resources, or other critical information.
Verify Resource Availability: Check the availability of resources needed for the tasks. Ensure that the resources are not over-allocated or scheduled for other tasks.
Review Scheduling Parameters: Look for any conflicts in the scheduling parameters. Adjust the start and finish dates or dependencies as necessary.
Check Configuration Settings: Review the configuration settings in the SAP system related to project or production planning. Ensure that they are set up correctly.
Unlock Objects: If the project or order is locked, coordinate with other users to unlock it or check for any background processes that may be holding the lock.
Change Status: If the project or order is in a status that does not allow scheduling, consider changing its status to allow for scheduling operations.
Consult Logs: Check the system logs for more detailed error messages or warnings that can provide additional context for the scheduling failure.
SAP Notes and Support: If the issue persists, consult SAP Notes for any known issues related to PEP259. You may also consider reaching out to SAP support for assistance.
Related Information
Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CO02 (Change Production Order), or CJI3 (Project Actual Line Items) to navigate and troubleshoot effectively.
Documentation: Review SAP documentation related to Project System and Production Planning for best practices in scheduling and managing projects/orders.
User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.
By following these steps, you should be able to diagnose and resolve the PEP259 error in SAP effectively.
Get instant SAP help. Start your 7-day free trial now.
PEP258
End date/time & & occurs before start date/time & / &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PEP257
Choose a valid weekday (1 through 7)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PEP339
Error occurred in function module 'JOB_CLOSE'
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PEP352
Error occurred in function module 'JOB_OPEN'
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.