How To Fix PEP235 - Nodes NODE_ID = &1 and &2 do not have a predecessor node


PEP235 - Overview

  • Message type: E = Error

  • Message class: PEP - Schedule Manager: Messages

  • Message number: 235

  • Message text: Nodes NODE_ID = &1 and &2 do not have a predecessor node

  • Show details Hide details
  • What causes this issue?

    There are at least two nodes without predecessor nodes. This is not
    possible.
    Technical information: Within a task group (comprising tasks of the same
    PARENT_ID), all tasks are connected to one another. The content of field
    NSIBLING_ID refers to the node NODE_ID of the next task. Since
    such a chain of nodes can necessarily
    only begin with one task, it follows that only that particular task
    NODE_ID can exist in a task group without a predecessor.
    If more than one node NODE_ID does not possess a predecessor (that is,
    more than one node has a NODE_ID that is not referenced by any
    NSIBLING_ID of another node of the same task group), the task list
    is faulty.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PEP235 - Nodes NODE_ID = &1 and &2 do not have a predecessor node ?
    The SAP error message PEP235 indicates that there is an issue with the predecessor relationship between nodes in a project or process structure, typically in the context of Project Management (PS) or Production Planning (PP) modules. The error message states that two nodes (identified by their IDs) do not have a predecessor node, which means that the system is unable to establish a proper sequence or hierarchy between these nodes.
    
    Cause: Missing Predecessor Definition: The nodes in question may not have been properly defined with a predecessor relationship. This can happen if the project structure was not set up correctly or if nodes were added without establishing the necessary links. Incorrect Node Configuration: The nodes may have been configured incorrectly, leading to a situation where the system cannot identify a predecessor for one or both nodes. Data Integrity Issues: There may be data integrity issues in the project structure, such as missing or corrupted

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker