How To Fix PEP190 - No scheduling carried out due to data.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PEP - Schedule Manager: Messages

  • Message number: 190

  • Message text: No scheduling carried out due to data.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PEP190 - No scheduling carried out due to data. ?

    The SAP error message PEP190 ("No scheduling carried out due to data") typically occurs in the context of project management and scheduling within SAP, particularly when working with Project System (PS) or Production Planning (PP) modules. This error indicates that the system could not perform scheduling for a project or order due to issues with the data provided.

    Causes of PEP190

    1. Missing or Incomplete Data: Required fields or data for scheduling may be missing. This can include dates, resources, or dependencies that are not properly defined.

    2. Incorrect Dates: The start or finish dates of activities may be set incorrectly, leading to scheduling conflicts.

    3. Resource Availability: Resources required for the project or order may not be available, or their availability may not be correctly defined in the system.

    4. Dependencies and Constraints: There may be logical constraints or dependencies that prevent the scheduling from being carried out.

    5. Status of Activities: Activities may be in a status that does not allow scheduling (e.g., completed or blocked).

    6. Project Structure Issues: The project structure may not be correctly set up, leading to issues in scheduling.

    Solutions to PEP190

    1. Check Data Completeness: Ensure that all required fields for scheduling are filled out correctly. This includes start and finish dates, resources, and any other relevant information.

    2. Review Dates: Verify that the dates for activities are logical and do not conflict with each other. Adjust any incorrect dates.

    3. Resource Management: Check the availability of resources and ensure that they are correctly assigned to the project or order. If resources are not available, consider reallocating or adjusting the schedule.

    4. Examine Dependencies: Review any dependencies or constraints that may be affecting the scheduling. Adjust them if necessary to allow for proper scheduling.

    5. Activity Status: Check the status of the activities involved. If any activities are marked as completed or blocked, you may need to change their status or adjust the scheduling accordingly.

    6. Project Structure Review: Ensure that the project structure is correctly defined and that all components are linked properly.

    7. Use Scheduling Tools: Utilize SAP's scheduling tools and reports to identify issues. Tools like the Project Planning Board or the Network Planning can help visualize and troubleshoot scheduling problems.

    Related Information

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ02 (Change Project), or CJI3 (Project Actual Line Items) to access project data and make necessary adjustments.

    • SAP Notes: Check for any SAP Notes related to PEP190 for specific patches or updates that may address known issues.

    • Documentation: Refer to SAP documentation or help files for detailed information on scheduling in the Project System or Production Planning modules.

    • Consult with SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.

    By following these steps, you should be able to identify and resolve the underlying issues causing the PEP190 error in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker