Do you have any question about this error?
Message type: E = Error
Message class: PEP - Schedule Manager: Messages
Message number: 113
Message text: Specify a valid offset
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PEP113
- Specify a valid offset ?The SAP error message PEP113, which states "Specify a valid offset," typically occurs in the context of SAP Project System (PS) or when dealing with project-related data. This error usually indicates that there is an issue with the offset value being used in a project or planning scenario.
Cause:
- Invalid Offset Value: The offset value specified in the project planning or scheduling does not fall within the acceptable range or is not valid for the context in which it is being used.
- Configuration Issues: There may be configuration settings in the project system that are not set up correctly, leading to invalid offsets.
- Data Entry Errors: Users may have entered an incorrect value or format for the offset, leading to this error.
- Missing Master Data: Required master data (like work breakdown structure elements or network activities) may not be properly defined or may be missing.
Solution:
- Check Offset Value: Review the offset value you are trying to use. Ensure that it is within the valid range and is appropriate for the context (e.g., project phase, task).
- Review Configuration: Check the configuration settings in the Project System to ensure that they are set up correctly. This may involve consulting with a system administrator or SAP consultant.
- Correct Data Entry: If the error is due to a data entry mistake, correct the offset value and try again.
- Validate Master Data: Ensure that all necessary master data is in place and correctly configured. This includes checking the work breakdown structure (WBS) elements, network activities, and any other relevant project data.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on valid offset values and their usage in your particular scenario.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to reach out to your SAP support team or a consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PEP112
Enter a start time
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PEP111
The selected function cannot be used for this task type
What causes this issue? You attempted to release a task.System Response The action was stopped.How to fix this error? You can only release jobs. Fo...
PEP114
Scheduling using working day offset 0 is not allowed for &!
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PEP115
Scheduling for &1 could not be completely deleted
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...