Do you have any question about this error?
Message type: E = Error
Message class: PDEXT - Message Class for iPPE Extraction
Message number: 305
Message text: Check for explosion parameters for &1 &2 successfully completed
The system has checked whether the iPPE model can be exploded with the
explosion parameters of the context (focus/filter).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PDEXT305
- Check for explosion parameters for &1 &2 successfully completed ?The SAP error message PDEXT305, which states "Check for explosion parameters for &1 &2 successfully completed," typically relates to issues in the context of the Production Planning (PP) module, particularly during the process of material explosion in the context of Bill of Materials (BOM) or production orders.
Cause:
The error message PDEXT305 is not necessarily an error in the traditional sense but rather an informational message indicating that the system has completed a check for explosion parameters for a specific material (represented by &1) and a specific plant or location (represented by &2). This message can occur in various scenarios, such as:
- BOM Explosion: When the system is trying to explode a BOM for a material and checks the parameters related to the explosion process.
- Configuration Issues: There may be configuration settings in the BOM or production order that need to be reviewed.
- Missing Data: Required data for the explosion process may be missing or incorrectly configured.
Solution:
To address the message and ensure that the explosion process works correctly, consider the following steps:
Review BOM Configuration: Check the BOM for the material in question to ensure that all components are correctly defined and that there are no missing or incorrect entries.
Check Explosion Parameters: Verify the explosion parameters in the material master and BOM settings. Ensure that the settings align with the requirements for the production process.
Analyze the Message Context: Look at the context in which the message appears. If it is part of a larger process (like creating a production order), ensure that all preceding steps have been completed successfully.
Consult Documentation: Refer to SAP documentation or help resources for specific details on the parameters being checked and any additional configuration that may be required.
Debugging: If the message is part of a larger issue, consider using transaction codes like SE80 or SE37 to debug the relevant function modules or programs to identify any underlying issues.
SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address known issues or provide additional guidance related to this message.
Related Information:
If the message is not causing any functional issues and is merely informational, it may not require any action. However, if it is part of a larger problem, following the steps above should help in diagnosing and resolving the underlying issue.
Get instant SAP help. Start your 7-day free trial now.
PDEXT304
Setup of model markers for &1 &2 successfully completed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PDEXT303
iPPE extraction completed - starting object processing for &1 &2
What causes this issue? The iPPE model has been exploded, and the object model has been set up for conversion.System Response The next step is to tr...
PDEXT306
Initialization of engineering change management for &1 &2 was successful
What causes this issue? The system has initialized engineering change management with the specified context (focus/filter).System Response This mean...
PDEXT307
Material &1 is used more than once in the structure &2 &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.