Do you have any question about this error?
Message type: E = Error
Message class: PDEXT - Message Class for iPPE Extraction
Message number: 029
Message text: Node &1 has relationships to node &2 with change number &3
The iPPE model contains structures that have been maintained with
history.
The explosion of the iPPE model has determined relationships between
node &V1& and node &V2& that have been maintained with history. For
this reason, further processing has been cancelled.
Check the status of the model in the result display.
Identify all the nodes where there are relationships that have been
maintained with history.
Note:
You <ZH>cannot</> save the status, because these structures cannot be
mapped in the conversion process.
Check in the iPPE model you have exploded that <ZH>no</> structures
that have been maintained with history need to be converted.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PDEXT029
- Node &1 has relationships to node &2 with change number &3 ?The SAP error message PDEXT029 indicates that there is a relationship between two nodes in a project structure that is being affected by a change number. This error typically arises in the context of project management or product data management within SAP, particularly when dealing with changes in the structure of a project or product.
Cause:
The error occurs when you attempt to perform an action (like deleting or changing a node) that is not allowed because there are existing relationships between the specified nodes. The message specifies:
This situation often arises when:
To resolve the PDEXT029 error, you can follow these steps:
Check Relationships: Review the relationships between the nodes involved. You can use transaction codes like CJ20N
(Project Builder) or CST01
(Change Management) to analyze the project structure and see how the nodes are interconnected.
Review Change Number: Investigate the change number mentioned in the error message. Ensure that all necessary approvals or actions related to this change number are completed. You may need to release or reject the change number if it is no longer needed.
Modify Relationships: If you need to delete or change node &1, you may first need to remove or adjust the relationships with node &2. This can involve:
Consult Documentation: Refer to SAP documentation or help resources for specific instructions on managing project structures and change management.
Seek Help from SAP Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting SAP Notes for any known issues or patches related to this error.
CJ20N
, CST01
, or CST02
for managing project structures and change management.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PDEXT028
Conversion not supported for iPPE usage production (PRD)
What causes this issue? You want to convert an iPPE model whose decomposition is based on iPPE usage <LS>Production</>. In this context, ...
PDEXT027
No iPPE object record could be determined in the catalog
What causes this issue? INCLUDE NA_PDEXT1Error message extract from SAP system. Copyright SAP SE. ...
PDEXT030
Node &1/variant &2 has relationships to color node &3 with color code &4
What causes this issue? Variant &V2& of node &V1& has a relationship to color node &V3&. In the conversion process, this rela...
PDEXT031
You cannot save - conversion was not started
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.