Message type: E = Error
Message class: PB - PD: Message IDs Org. Management
Message number: 600
Message text: Please select a start date between & and &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PB600
- Please select a start date between & and & ?The SAP error message PB600, which states "Please select a start date between & and &," typically occurs in the context of planning or scheduling activities within SAP, particularly in modules like SAP Project System (PS) or SAP Production Planning (PP). This error indicates that the date you have selected for a particular operation or task falls outside the permissible range defined in the system.
Cause:
- Date Range Violation: The start date you are trying to enter is either before the earliest allowed date or after the latest allowed date set in the system.
- Configuration Settings: The date limits may be configured in the system settings, such as in the project definition or production order settings.
- Calendar Settings: The system may have specific calendar settings that restrict the dates based on working days or holidays.
- Data Entry Error: There may be a simple mistake in the date entry, such as a typo or incorrect format.
Solution:
- Check Date Range: Review the error message to identify the valid date range indicated by the placeholders (& and &). Ensure that the date you are trying to enter falls within this range.
- Adjust Dates: If your selected date is outside the allowed range, choose a date that is within the specified limits.
- Review Configuration: If you believe the date range should be different, consult with your SAP administrator or configuration team to review the settings for the project or order.
- Check Calendar Settings: Ensure that the calendar settings in the system are correctly configured to reflect the working days and holidays.
- Data Entry Verification: Double-check the format and correctness of the date you are entering to ensure it is valid.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PB523
Object type &1 is not supported for determining cost centers
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PB522
No details relating to controlling area &1 could be determined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PB601
Select a personnel action
What causes this issue? Persons are affected by the action you want to execute. An action designation must be made for these persons.How to fix this ...
PB602
Move function is not possible in all cases
What causes this issue? There are some objects in the set you have selected that cannot be moved on the date specified. The system issues an error me...
Click on this link to search all SAP messages.