How To Fix PB113 - The corresponding master cost center is in controlling area &


PB113 - Overview

  • Message type: E = Error

  • Message class: PB - PD: Message IDs Org. Management

  • Message number: 113

  • Message text: The corresponding master cost center is in controlling area &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PB113 - The corresponding master cost center is in controlling area & ?
    The SAP error message PB113 indicates that there is an issue related to the master cost center in the controlling area. This error typically arises when you are trying to perform an operation that involves a cost center, but the system cannot find the corresponding master cost center in the specified controlling area.
    
    Cause: Cost Center Not Defined: The cost center you are trying to use may not be defined in the specified controlling area. Incorrect Controlling Area: The controlling area associated with the cost center may not match the one you are trying to use. Inactive Cost Center: The cost center might be inactive or not available for the period you are trying to post to. Master Data Issues: There may be issues with the master data configuration or settings in the system.
    Solution: Check Cost Center Master Data: Go to the transaction code KS03 (Display Cost Center) and check if the cost center exists in the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker