Message type: E = Error
Message class: P0 - Messages for Transactions PE01, PE02 and PE03
Message number: 099
Message text: Do not enter a priority greater than 32
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
P0099
- Do not enter a priority greater than 32 ?The SAP error message P0099, which states "Do not enter a priority greater than 32," typically occurs in the context of SAP's scheduling or prioritization features, such as when working with production orders, work orders, or other processes that involve priority settings.
Cause:
The error is triggered when a user attempts to assign a priority value that exceeds the maximum allowable limit of 32. In SAP, priority values are often used to determine the order in which tasks or orders should be processed. The system has a predefined range for these values, and entering a number greater than 32 violates this constraint.
Solution:
To resolve this error, you should:
Check the Priority Value: Review the priority value you are trying to enter. Ensure that it is within the acceptable range (typically between 0 and 32).
Adjust the Value: If you find that the value exceeds 32, change it to a valid number within the range. For example, if you entered 35, change it to 32 or lower.
Review Documentation: If you are unsure about the priority settings, refer to the relevant SAP documentation or user manuals for guidance on how to set priorities correctly.
Consult with a SAP Administrator: If you continue to experience issues or if the priority settings are part of a larger configuration, it may be helpful to consult with a SAP administrator or a functional consultant who can provide insights into the specific configuration of your SAP system.
Related Information:
By following these steps, you should be able to resolve the P0099 error and continue with your SAP processes without further issues.
Get instant SAP help. Sign up for our Free Essentials Plan.
P0098
Error when processing the OCX tree
What causes this issue? A general error has occurred which is linked to the processing of events or tree structure data for input help for individual...
P0097
Error in the dictionary structure for tree generation
What causes this issue? A tree structure for a modeless window has been prepared for generating the input help for single fields. This is stored in t...
P0100
Form & does not exist
Form &V1& is not entered in the form directory (table T514D) for country grouping &V2&.Error message extract from SAP system. Copyrig...
P0101
Form & already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.