Message type: E = Error
Message class: P/ -
Message number: 078
Message text: The material & has no BOM or the BOM was not saved to the material, yet.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
P/078
- The material & has no BOM or the BOM was not saved to the material, yet. ?The SAP error message P/078 indicates that the material you are trying to work with does not have a Bill of Materials (BOM) associated with it, or the BOM has not been saved correctly. This error typically occurs in scenarios where a BOM is required for production planning, material requirements planning, or other related processes.
Cause: No BOM Exists: The material you are trying to use does not have a BOM created in the system. BOM Not Saved: The BOM was created but not saved properly, or there was an error during the saving process. Incorrect Material Type: The material type may not be configured to allow BOMs. Plant-Specific BOM: The BOM may exist but is not assigned to the specific plant you are working with. Authorization Issues: There may be authorization issues preventing the system from accessing the BOM.
Solution: Create a BOM: Go to the transaction code CS01 (Create BOM) and create a BOM for the material
Get instant SAP help. Sign up for our Free Essentials Plan.
P/077
The material & is not assigned to a routing.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P/076
There are no lines selected.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P/079
Maintenance canceled.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P/080
The periods of the group & are unequal to the ref. operation set &.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.