Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: P/ -
Message number: 050
Message text: Please choose a valid sequence.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
P/050
- Please choose a valid sequence. ?The SAP error message "P/050 Please choose a valid sequence" typically occurs in the context of production planning or order processing within the SAP system. This error indicates that the system is expecting a valid sequence number or operation sequence that is not currently available or has not been defined correctly.
Causes:
- Invalid Sequence Number: The sequence number you are trying to use does not exist in the system or is not valid for the current operation.
- Missing Configuration: The configuration for the production order or routing may not be set up correctly, leading to the absence of valid sequences.
- Data Inconsistency: There may be inconsistencies in the master data, such as the routing or bill of materials (BOM) that are linked to the production order.
- User Input Error: The user may have entered an incorrect sequence number or selected an invalid option from a dropdown.
Solutions:
- Check Sequence Numbers: Verify that the sequence number you are trying to use is valid. You can do this by checking the routing or production order details.
- Review Routing Configuration: Ensure that the routing for the production order is correctly defined and that all necessary sequences are included.
- Update Master Data: If there are inconsistencies in the master data, such as missing or incorrect routing or BOM entries, update them accordingly.
- User Training: If the error is due to user input, consider providing additional training or documentation to help users understand how to select valid sequences.
- Consult SAP Documentation: Refer to SAP help documentation or transaction codes like CA03 (Display Routing) to check the details of the routing and sequences.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
P/049
Number of indiviual capacities can't be lower than one.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P/048
Save changes made to time dependent standard values!
You have made changes to the time-dependent standard values. Activate the changes by saving.Error message extract from SAP system. Copyright SAP SE. ...
P/051
Yield in percentage can not be greater than 100%.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P/052
A plan with date from & already exists
What causes this issue? A plannin with date-from date already exists. The system issues an error message and will not allow you to continue with this...
Click on this link to search all SAP messages.