Do you have any question about this error?
Message type: E = Error
Message class: P/ -
Message number: 038
Message text: Please choose a valid factory-calendar-id.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
P/038
- Please choose a valid factory-calendar-id. ?The SAP error message P/038 "Please choose a valid factory-calendar-id" typically occurs when a user attempts to perform an action that requires a valid factory calendar ID, but the system cannot find or recognize the ID provided. This can happen in various contexts, such as during production planning, scheduling, or when working with specific modules that rely on factory calendars.
Causes:
- Invalid Factory Calendar ID: The ID entered does not exist in the system or is incorrectly typed.
- Missing Configuration: The factory calendar has not been set up or configured properly in the system.
- Authorization Issues: The user may not have the necessary permissions to access the factory calendar.
- Data Inconsistencies: There may be inconsistencies or corruption in the data related to factory calendars.
Solutions:
Verify Factory Calendar ID:
- Check the factory calendar ID you are using. Ensure it is correctly entered and exists in the system.
- You can do this by navigating to the relevant configuration or master data area in SAP where factory calendars are maintained.
Create or Update Factory Calendar:
- If the factory calendar does not exist, you may need to create a new one. This can typically be done in the configuration settings under the relevant module (e.g., Production Planning).
- If it exists but is not configured correctly, update the calendar settings as needed.
Check Authorizations:
- Ensure that your user profile has the necessary authorizations to access and use the factory calendar. You may need to contact your SAP security administrator for assistance.
Consult Documentation:
- Refer to SAP documentation or help resources for specific instructions on how to manage factory calendars in your version of SAP.
Check for Data Issues:
- If you suspect data inconsistencies, you may need to run data consistency checks or consult with your SAP Basis team to investigate further.
Contact Support:
- If the issue persists after trying the above solutions, consider reaching out to your internal SAP support team or SAP support for further assistance.
Related Information:
SCAL
- for maintaining factory calendars.OPKP
- for defining the calendar in the production planning module.By following these steps, you should be able to resolve the P/038 error and ensure that you are using a valid factory calendar ID in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
P/037
Choose a valid record first.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P/035
The operating time of an entry is greater than 24h. Value(s) changed.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P/039
There is no belonging from a BOM to a material
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P/040
The period ID is invalid. Please check entry
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.