Message type: E = Error
Message class: ORB - Project-Related Incoming Orders/Open Orders
Message number: 104
Message text: The open order value in the object checked has not been leveled
The current object could not be processed. The open order value could
not be leveled and shows the following balance:
Revenue,,&V1&
Costs:,,&V2&
Check the error messages for this object. Correct the error(s) and run
the calculation of project-related incoming orders again.
Error message extract from SAP system. Copyright SAP SE.
ORB104
- The open order value in the object checked has not been leveled ?The SAP error message ORB104 indicates that the open order value in the object being checked has not been leveled. This typically occurs in the context of production planning and control, particularly when dealing with order management and capacity planning.
Cause:
The error can arise due to several reasons, including:
- Unbalanced Orders: The open orders may not be balanced against the available capacity or resources, leading to discrepancies in the planning process.
- Incorrect Configuration: There may be issues with the configuration of the planning parameters or settings in the system.
- Data Inconsistencies: There could be inconsistencies in the master data, such as material master records, bill of materials (BOM), or routing information.
- Planning Run Issues: If a planning run was not executed correctly or if there were errors during the planning process, it could lead to unlevelled orders.
Solution:
To resolve the ORB104 error, you can take the following steps:
- Check Open Orders: Review the open orders in the system to ensure they are correctly defined and balanced. Look for any discrepancies in quantities or dates.
- Run Planning: Execute a planning run (e.g., MRP run) to level the orders. This can help in redistributing the load and balancing the open order values.
- Review Configuration: Check the configuration settings related to production planning and ensure they are set up correctly. This includes checking the planning parameters and strategies.
- Validate Master Data: Ensure that all relevant master data (material master, BOM, routing) is accurate and up to date. Correct any inconsistencies found.
- Analyze Capacity: Review the capacity planning and ensure that the resources are adequately defined and available for the production orders.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to your version of SAP and the context in which the error occurs.
Related Information:
By following these steps, you should be able to identify the root cause of the ORB104 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
ORB103
Object not processed
What causes this issue? The object could not be processed in the determination of the incoming order value. Possible causes: No results analysis key ...
ORB102
Object does not have required status &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
ORB105
No assignment to an incoming order cost element maintained for &1
What causes this issue? Incoming order values are recorded under separate incoming order cost elements (cost element category 50 to 52). To this end,...
ORB106
No results analysis key maintained for the WBS element &1
What causes this issue? It is the results analysis key defined in the master data which determines how the incoming order value is determined. For th...