Message type: E = Error
Message class: OPS_SE_PUR - Purchasing: Messages for Service Enabling
Message number: 003
Message text: Unit code of schedule line &1 is taken from item (item &2)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
OPS_SE_PUR003
- Unit code of schedule line &1 is taken from item (item &2) ?The SAP error message OPS_SE_PUR003 indicates that there is an issue with the unit code of a schedule line in a purchase order. Specifically, it suggests that the unit code for the schedule line is being derived from the item level, which may not be appropriate or expected in the context of the transaction.
Cause: Inconsistent Unit of Measure: The unit of measure (UoM) for the schedule line may not match the expected unit of measure for the item. This can happen if the item is defined with a different UoM than what is being used in the schedule line.
Configuration Issues: There may be configuration settings in the material master or purchasing info records that are causing the system to pull the unit of measure incorrectly. Data Entry Errors: Manual entry errors during the creation of the purchase order or schedule line can lead to mismatches in the unit of measure.
Solution: Check Material Master:
Get instant SAP help. Sign up for our Free Essentials Plan.
OPS_SE_PUR002
Total amount of item price is calculated automatically (item &1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OPS_SE_PUR001
Currency is derived from header (item &1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OPS_SE_PUR004
Controlling areas must be identical (CO area1 = &1; CO area2 = &2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OPS_SE_PUR005
Enter a PartyID
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.