How To Fix OM530 - Cost center credit = 1 only if activity update = 2


OM530 - Overview

  • Message type: E = Error

  • Message class: OM - Customizing Materialwirtschaft

  • Message number: 530

  • Message text: Cost center credit = 1 only if activity update = 2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OM530 - Cost center credit = 1 only if activity update = 2 ?
    The SAP error message OM530 typically occurs in the context of activity allocation or cost center accounting. This error indicates that there is a mismatch in the configuration or data entry related to the activity types and their allocation to cost centers.
    
    Cause: The error message "OM530 Cost center credit = 1 only if activity update = 2" generally arises due to one of the following reasons: Activity Type Configuration: The activity type may not be properly configured to allow for the type of allocation you are trying to perform. Specifically, the system expects that if a cost center is credited (i.e., receiving costs), the activity update should be set to a specific value (in this case, 2). Incorrect Activity Allocation: The activity allocation might be incorrectly set up in the system, leading to a situation where the system cannot process the allocation as intended. Master Data Issues: There may be issues with the master

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author