Do you have any question about this error?
Message type: E = Error
Message class: OM - Customizing Materialwirtschaft
Message number: 509
Message text: Maximum of 3 currencies/valuations permitted
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
OM509
- Maximum of 3 currencies/valuations permitted ?The SAP error message OM509, which states "Maximum of 3 currencies/valuations permitted," typically occurs in the context of configuring or using the SAP system for financial transactions, particularly in relation to currency valuation and reporting.
Cause:
This error arises when a user attempts to assign more than three currencies or valuations to a particular financial object, such as a cost center, internal order, or profit center. SAP has a limitation that allows only three currencies to be assigned for valuation purposes. These currencies usually include:
- Company Code Currency: The primary currency in which the company operates.
- Group Currency: The currency used for consolidation purposes across multiple company codes.
- Hard Currency: A currency that is used for specific reporting or valuation purposes, often used in international transactions.
If you try to add a fourth currency or valuation, the system will trigger the OM509 error.
Solution:
To resolve the OM509 error, you can take the following steps:
Review Currency Assignments: Check the current currency assignments for the financial object in question. You can do this by navigating to the relevant configuration or master data screen in SAP.
Remove Unnecessary Currencies: If there are currencies that are not needed, consider removing them to stay within the limit of three. This may involve discussions with your finance team to ensure that the necessary reporting and valuation needs are still met.
Use Alternative Valuation Methods: If you need to work with more than three currencies, consider using alternative methods for reporting or valuation, such as using different reporting tools or customizing reports to handle additional currencies outside of the standard valuation settings.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on currency configuration and limitations. This can provide insights into best practices for managing currency assignments.
Contact SAP Support: If you are unable to resolve the issue through the above steps, consider reaching out to SAP support for assistance. They may provide additional insights or solutions based on your specific configuration and requirements.
Related Information:
By following these steps, you should be able to address the OM509 error and ensure that your currency assignments are compliant with SAP's limitations.
Get instant SAP help. Start your 7-day free trial now.
OM508
Naming rule &1 is already being used. Deletion not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OM507
Update of actual quantity in plant &1 can no longer be cancelled
What causes this issue? The actual quantity update can no longer be cancelled, as updates have already been carried out.System Response The <LS&g...
OM510
Quantity structure type &1 is already being used. You cannot delete
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OM511
Quantity structure type &1 is already being used. You cannot change it
What causes this issue? You want to change the time-dependency. As the quantity structure category &V1& is already used with this control, an...
Click on this link to search all SAP messages.