Do you have any question about this error?
Message type: E = Error
Message class: OM - Customizing Materialwirtschaft
Message number: 443
Message text: Enter currency type 2 first
You have entered currency types without paying attention to the order
of their entry. In this case, you have an entry in the field
<LS>Currency type 3</>, but there is not yet an entry in the field
<LS>Currency type 2</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Enter the currency types in the right order.
If you wish to enter two currency types only, enter them in the fields
<LS>Currency type 1</> and <LS>Currency type 2</>.
Error message extract from SAP system. Copyright SAP SE.
OM443
- Enter currency type 2 first ?The SAP error message "OM443 Enter currency type 2 first" typically occurs in the context of configuring or managing currency types in the SAP system, particularly in the area of controlling (CO) or financial accounting (FI). This error indicates that the system requires you to enter a specific currency type (currency type 2) before proceeding with the current operation.
Cause:
- Currency Type Configuration: The error usually arises when the system expects a currency type to be defined or entered before it can process the current transaction or configuration. Currency type 2 is often used for specific purposes, such as parallel currencies or specific reporting requirements.
- Missing Data: If the necessary data for currency type 2 has not been entered or configured in the system, the error will be triggered.
- Transaction Sequence: The error may also occur if the sequence of transactions is incorrect, where the system expects certain entries to be made in a specific order.
Solution:
- Enter Currency Type 2: Navigate to the relevant transaction or configuration screen where the error occurred and ensure that you enter the required currency type 2. This may involve selecting or inputting the currency type in the appropriate field.
- Check Configuration: Go to the configuration settings for currencies in the SAP system (usually found in the SPRO transaction under Financial Accounting or Controlling) and ensure that currency type 2 is properly defined and set up.
- Review Transaction Flow: Ensure that you are following the correct sequence of steps in your transaction. If you are in a multi-currency environment, make sure that all necessary currency types are entered in the correct order.
- Consult Documentation: If you are unsure about the specific requirements for currency type 2, refer to SAP documentation or help resources for guidance on how to configure and use currency types effectively.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in financial accounting or controlling within SAP.
Get instant SAP help. Start your 7-day free trial now.
OM442
Enter currency type 1 first
What causes this issue? You have entered currency types without paying attention to the order of their entry. In this case, you have an entry in the ...
OM441
Only choose different currency types
What causes this issue? You have attempted to assign more than one currency type to a material ledger type.System Response The system issues an erro...
OM444
Mat. ledger type cannot be changed as valuation area &1 is live
What causes this issue? You are trying to change the assignment or characteristic of the <DS:GLOS.3526B6D7AFAB52B9E10000009B38F974>material led...
OM445
When conversion at assumed exchg rate is active, enter exchg rate type
What causes this issue? You have activated calculation at the assumed exchange rate, you must therefore enter an exchange rate type.System Response H...
Click on this link to search all SAP messages.