How To Fix OIUX3403 - New PUN fields must not be entered before NM Rewrite Go-Live Date


OIUX3403 - Overview

  • Message type: E = Error

  • Message class: OIUX3 - Tax Reporting

  • Message number: 403

  • Message text: New PUN fields must not be entered before NM Rewrite Go-Live Date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIUX3403 - New PUN fields must not be entered before NM Rewrite Go-Live Date ?
    The SAP error message OIUX3403, which states "New PUN fields must not be entered before NM Rewrite Go-Live Date," typically occurs in the context of SAP's Utilities module, particularly when dealing with the New Metering (NM) functionality. This error indicates that certain fields related to the new PUN (Point of Use Number) cannot be populated or modified before a specified go-live date for the NM Rewrite project.
    
    Cause: Timing Restrictions: The error is triggered because the system is designed to prevent changes to specific fields until the NM Rewrite project has officially gone live. This is a safeguard to ensure data integrity and consistency during the transition to the new system. Configuration Settings: The system may have been configured to restrict access to certain functionalities until the go-live date is reached.
    Solution: Check Go-Live Date: Verify the official go-live date for the NM Rewrite project. Ensure that you are not attempting to enter or modify

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author