How To Fix OIUSB106 - Cap.Pt.& & must be tied to same DN/Venture/DOI& & within effective dates.


OIUSB106 - Overview

  • Message type: E = Error

  • Message class: OIUSB - E&P Sales and Balancing Messages

  • Message number: 106

  • Message text: Cap.Pt.& & must be tied to same DN/Venture/DOI& & within effective dates.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIUSB106 - Cap.Pt.& & must be tied to same DN/Venture/DOI& & within effective dates. ?
    The SAP error message OIUSB106 indicates that there is an issue with the configuration of a capital project (Cap. Pt.) in relation to its associated data, specifically the Domain Name (DN), Venture, and Date of Interest (DOI). This error typically arises when the capital project is not properly linked to the same DN, Venture, or DOI within the specified effective dates.
    
    Cause: Mismatch in Configuration: The capital project (Cap. Pt.) is not associated with the same Domain Name (DN), Venture, or Date of Interest (DOI) as required. Effective Dates: The effective dates for the capital project and the associated DN/Venture/DOI do not align, leading to the error. Data Entry Errors: There may be typographical errors or incorrect entries in the project setup or associated records.
    Solution: Check Configuration: Verify that the capital project is correctly configured to link with the appropriate DN, Venture, and DOI. Ensure that all entries are consistent and correct. Align Effective Dates: Ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant