How To Fix OIURV210 - Date Range of Contract must span &1 and &2.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: OIURV - E&P Revenue Messages

  • Message number: 210

  • Message text: Date Range of Contract must span &1 and &2.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIURV210 - Date Range of Contract must span &1 and &2. ?

    The SAP error message OIURV210, which states "Date Range of Contract must span &1 and &2," typically occurs in the context of contract management within the SAP system, particularly in the Oil and Gas industry (as indicated by the OI prefix). This error indicates that the date range specified for a contract does not cover the required dates, which are represented by &1 and &2 in the error message.

    Cause:

    The error is usually caused by one of the following reasons:

    1. Incorrect Date Range: The start and end dates of the contract do not encompass the required date range. For example, if the system expects the contract to be valid for a specific period and the dates provided do not cover that period, this error will occur.
    2. Missing Dates: The contract may not have been set up with the necessary start and end dates, or the dates may have been entered incorrectly.
    3. Contract Validity: The contract may need to be valid for certain transactions or processes that require it to span specific dates.

    Solution:

    To resolve the OIURV210 error, you can take the following steps:

    1. Check Contract Dates:

      • Navigate to the contract in question and verify the start and end dates.
      • Ensure that the date range covers the required dates indicated in the error message.
    2. Adjust Dates:

      • If the dates are incorrect, update the contract to ensure that the start date is before or on the same day as the end date, and that the range includes the dates specified in the error message.
    3. Review Contract Validity:

      • Ensure that the contract is valid for the intended transactions. If necessary, create a new contract with the correct date range.
    4. Consult Documentation:

      • Review any relevant SAP documentation or user manuals related to contract management to ensure compliance with the system's requirements.
    5. Seek Help from SAP Support:

      • If the issue persists after checking the dates and making adjustments, consider reaching out to your SAP support team or consulting SAP Notes for any known issues or patches related to this error.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes for contract management, such as ME31K (Create Contract), ME32K (Change Contract), and ME33K (Display Contract).
    • SAP Notes: Check SAP Notes for any updates or patches that may address this specific error message.
    • User Roles: Ensure that you have the appropriate permissions to modify contract details in the SAP system.

    By following these steps, you should be able to resolve the OIURV210 error and ensure that your contract dates are correctly set up.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author