Do you have any question about this error?
Message type: E = Error
Message class: OIURV - E&P Revenue Messages
Message number: 195
Message text: Contract End date cannot be greater than the contract start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
OIURV195
- Contract End date cannot be greater than the contract start date ?The SAP error message OIURV195 indicates that there is an issue with the contract dates in the system. Specifically, it means that the end date of a contract cannot be set to a date that is later than the start date. This is a logical constraint, as a contract cannot end before it starts.
Cause:
- Incorrect Date Entry: The most common cause of this error is that the user has mistakenly entered the end date as being earlier than the start date.
- Data Migration Issues: If data has been migrated from another system, there may be inconsistencies in the date entries.
- System Configuration: In some cases, the system configuration or customizations may lead to unexpected behavior regarding date validations.
Solution:
- Check Dates: Review the contract details and ensure that the end date is set to a date that is equal to or later than the start date.
- Correct the Entry: If the end date is incorrect, update it to a valid date that meets the requirement.
- Data Validation: If this error occurs during data migration or batch processing, validate the data beforehand to ensure that all date entries are correct.
- Consult Documentation: If you are unsure about the correct dates, refer to the relevant documentation or consult with a colleague or supervisor who is familiar with the contract terms.
- System Configuration Review: If the issue persists and seems to be related to system behavior, consult with your SAP administrator or technical team to review the configuration settings.
Related Information:
By ensuring that the contract end date is always on or after the start date, you can avoid encountering this error in the future.
Get instant SAP help. Start your 7-day free trial now.
OIURV194
Invalid combination of selection parameters for Contract List Processing
What causes this issue? At least one of the following parameters or combination of parameters must be entered: Contract group Contract Contract type ...
OIURV193
If Gplt Company, Venture, or DOI is entered all 3 must be entered
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIURV196
Well Completion & & is not a node on Delivery Network &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIURV197
Measurement point & is not a node on Delivery Network &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.