Do you have any question about this error?
Message type: E = Error
Message class: OIURR - Production Regulatory Reporting
Message number: 512
Message text: New Production MP has to be setup for new MMS Code
The metering point ID is the agency-assigned external ID for the
measurement point, which represents the agency's designation for the
relevant measurement point.
When the MMS reassigns FMP numbers, a new production MP has to be
created and tied to the new MMS FMP. This includes amended reports for
periods prior to the assignment of the new FMP.
New Production MP has to be setup for new MMS Code
Create a new Metering Point and attach it to the MP.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
OIURR512
- New Production MP has to be setup for new MMS Code ?The SAP error message OIURR512, which states "New Production MP has to be setup for new MMS Code," typically occurs in the context of SAP's Oil and Gas or Materials Management modules. This error indicates that there is a new MMS (Material Management System) code that has been introduced, but the corresponding production master data (MP) has not been set up in the system.
Cause:
- New MMS Code: A new MMS code has been created or introduced in the system, but the necessary production master data has not been configured.
- Missing Configuration: The production master data (like production versions, BOMs, routing, etc.) for the new MMS code is missing or incomplete.
- Data Migration Issues: If data was migrated from another system or if there were recent changes in the configuration, it might not have been fully set up.
Solution:
Set Up Production Master Data:
- Navigate to the relevant transaction in SAP (such as C223 for production version, CS01 for BOM, or CA01 for routing) to create or update the production master data for the new MMS code.
- Ensure that all necessary components, such as BOMs, routings, and production versions, are created and linked to the new MMS code.
Check Configuration:
- Verify that the configuration settings for the MMS code are correct. This may involve checking the customizing settings in SPRO related to production planning and materials management.
Consult Documentation:
- Review any documentation or change logs related to the introduction of the new MMS code to ensure that all necessary steps have been followed.
Testing:
- After setting up the required master data, perform tests to ensure that the error does not reoccur and that the new MMS code functions as expected in production scenarios.
Contact Support:
- If the issue persists after following the above steps, consider reaching out to your SAP support team or consulting SAP Notes for any known issues or patches related to this error.
Related Information:
By following these steps, you should be able to resolve the OIURR512 error and ensure that the new MMS code is properly set up in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
OIURR511
No output found for selected entry
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIURR510
+
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIURR600
Total Override Group Allocation is not 100% for WC - &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIURR601
Blank Override Group exists with non zero percent
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.