How To Fix OIURR222 - Date Overlap:Setting start date to earliest possible value greater than &


OIURR222 - Overview

  • Message type: E = Error

  • Message class: OIURR - Production Regulatory Reporting

  • Message number: 222

  • Message text: Date Overlap:Setting start date to earliest possible value greater than &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIURR222 - Date Overlap:Setting start date to earliest possible value greater than & ?
    The SAP error message OIURR222, which states "Date Overlap: Setting start date to earliest possible value greater than &," typically occurs in the context of SAP's Oil and Gas (O&G) module, particularly when dealing with resource management or scheduling. This error indicates that there is a conflict with date ranges for certain operations, such as resource allocation, scheduling, or contract management.
    
    Cause: The error is triggered when there is an attempt to set a start date for a resource or operation that overlaps with an existing date range. This can happen due to: Overlapping Date Ranges: The new date range you are trying to set conflicts with an existing date range in the system. Incorrect Data Entry: The dates entered may not be valid or may not follow the expected sequence (e.g., a start date is set after an end date).
    Configuration Issues: There may be configuration settings in the system that enforce strict date

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker