Message text: Network tolerance out of user-specified range
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
OIUPR761
- Network tolerance out of user-specified range ?The SAP error message OIUPR761, which states "Network tolerance out of user-specified range," typically occurs in the context of project management or network planning within SAP. This error indicates that the tolerance settings for a network (or project) are not being met, which can lead to issues in scheduling, resource allocation, or project execution.
Cause:
- Tolerance Settings: The error is often caused by the network's planned dates or durations exceeding the user-defined tolerances. This can happen if the actual progress of the project deviates significantly from the planned schedule.
- Configuration Issues: The tolerance settings may not be configured correctly in the system, leading to discrepancies when actual data is compared against planned data.
- Data Entry Errors: Incorrect data entry for project activities, such as start and finish dates, can also trigger this error.
Solution:
- Review Tolerance Settings: Check the tolerance settings in the project or network configuration. Ensure that they are set appropriately for the project's requirements. You can do this by navigating to the relevant configuration settings in SAP.
- Adjust Dates/Durations: If the actual progress of the project is valid, consider adjusting the planned dates or durations to align with the actuals, provided this is acceptable within the project's scope.
- Consult Project Management Guidelines: Ensure that the project management guidelines are being followed, and that any changes to the project plan are documented and approved.
- Error Analysis: Use transaction codes like CJ20N (Project Builder) or CN41 (Network Analysis) to analyze the network and identify where the tolerance is being exceeded.
- User Training: Ensure that users entering data into the system are trained on the importance of adhering to tolerance settings and how to manage project schedules effectively.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who specializes in SAP project management.
Get instant SAP help. Start your 7-day free trial now.
OIUPR760
The listed MP contains all deduct meters immediately upstream
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIUPR759
Adjusted theoretical was not calculated for listed well/wc
What causes this issue? Producing well/well completion has been calculated as 0, even after accounting for dependent material/vt allocations.System ...
OIUPR762
A positive amount can not be adjusted to one or more upstream nwk nodes
What causes this issue? The sum of the upstream theoreticals and/or metered volumes is equal to zeroSystem Response The system issues an error messa...
OIUPR763
Non alloc or theo meter on same level as Fuel System final disposition MP
What causes this issue? FUEL SYSTEM FINAL DISPOSITION MP FOUND SAME LEVEL AS METER OTHER THAN ALLOC., THEO, DEDUCT OR FUEL SYSTEM FINAL DISPOSITION M...
Click on this link to search all SAP messages.