How To Fix OIUPR409 - Well Completion and Measurement Point cannot both be entered.


OIUPR409 - Overview

  • Message type: E = Error

  • Message class: OIUPR - PRA Production Messages

  • Message number: 409

  • Message text: Well Completion and Measurement Point cannot both be entered.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIUPR409 - Well Completion and Measurement Point cannot both be entered. ?
    The SAP error message OIUPR409 indicates that there is a conflict in the data entry for well completion and measurement point in the system. This error typically arises in the context of oil and gas industry applications within SAP, particularly when dealing with production and measurement data.
    
    Cause: The error occurs when both a well completion and a measurement point are specified in a transaction or data entry where only one of them is allowed. This can happen due to: Incorrect Data Entry: The user may have inadvertently entered both fields when only one is required.
    Configuration Issues: The system may be configured in a way that does not allow both fields to be populated simultaneously. Business Logic: The business process may dictate that only one of the two should be used for a specific transaction.
    Solution: To resolve the OIUPR409 error, you can take the following steps: Review Data Entry: Check the transaction or data entry screen

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker