Do you have any question about this error?
Message type: E = Error
Message class: OIUPR - PRA Production Messages
Message number: 303
Message text: The entered WC was not in a Delivery Network.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
When the Premas Configuration Edit is turned on, the WC entered must
exist in a Delivery Network for the Effective Dates.
Error message extract from SAP system. Copyright SAP SE.
OIUPR303
- The entered WC was not in a Delivery Network. ?The SAP error message OIUPR303, which states "The entered WC was not in a Delivery Network," typically occurs in the context of SAP's Plant Maintenance (PM) or Production Planning (PP) modules. This error indicates that the Work Center (WC) you are trying to use is not part of the specified Delivery Network.
Cause:
- Work Center Not Assigned: The Work Center you are trying to use is not assigned to the Delivery Network you are working with.
- Incorrect Configuration: There may be a configuration issue where the Work Center is not properly linked to the relevant Delivery Network.
- Network Definition: The Delivery Network itself may not be defined correctly or may not include the Work Center in question.
Solution:
Check Work Center Assignment:
- Go to the transaction code
CR02
(Change Work Center) and verify if the Work Center is assigned to the correct Plant and is part of the relevant Delivery Network.- If it is not assigned, you may need to add it to the Delivery Network.
Review Delivery Network Configuration:
- Use transaction code
CNO1
(Create Network) orCNO2
(Change Network) to check the configuration of the Delivery Network.- Ensure that the Work Center is included in the network activities.
Update Master Data:
- If the Work Center is missing from the Delivery Network, you may need to update the master data to include it.
- Ensure that all relevant parameters and settings are correctly configured.
Consult Documentation:
- Review SAP documentation or help files related to Work Centers and Delivery Networks for additional guidance on configuration.
Check User Authorizations:
- Ensure that you have the necessary authorizations to access and modify the Work Center and Delivery Network settings.
Related Information:
Transaction Codes:
CR01
/ CR02
/ CR03
: Create, Change, and Display Work Centers.CNO1
/ CNO2
/ CNO3
: Create, Change, and Display Networks.SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
OIUPR302
The entered MP was not in a Delivery Network.
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
OIUPR301
Effective To Date was not the last day of the month. See long text.
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
OIUPR304
Effective To Date was not the same as the Effective From Date.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIUPR305
When Volume Type is Measured Production, the Major Product must be Gas.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.