How To Fix OIUPR138 - Upstream Node must be different than Downstream Node


OIUPR138 - Overview

  • Message type: E = Error

  • Message class: OIUPR - PRA Production Messages

  • Message number: 138

  • Message text: Upstream Node must be different than Downstream Node

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIUPR138 - Upstream Node must be different than Downstream Node ?
    The SAP error message OIUPR138, which states "Upstream Node must be different than Downstream Node," typically occurs in the context of SAP's Oil and Gas (Upstream) module, particularly when dealing with the configuration of transportation networks or pipeline systems.
    
    Cause: This error arises when there is an attempt to define a relationship or connection between two nodes (e.g., facilities, locations, or points in a pipeline) where both nodes are the same. In other words, the system is trying to set up a flow or connection from a node to itself, which is logically incorrect in the context of upstream operations.
    Solution: To resolve this error, you should: Check Node Definitions: Review the definitions of the upstream and downstream nodes in your configuration. Ensure that they are distinct entities. Correct Node Assignments: If you find that the upstream and downstream nodes are incorrectly assigned to the same node, change one of them to a different, valid

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant