How To Fix OIUPR032 - Contract is not effective for entire measuremnt point period.


OIUPR032 - Overview

  • Message type: E = Error

  • Message class: OIUPR - PRA Production Messages

  • Message number: 032

  • Message text: Contract is not effective for entire measuremnt point period.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIUPR032 - Contract is not effective for entire measuremnt point period. ?
    The SAP error message OIUPR032 indicates that a contract is not effective for the entire measurement point period. This typically occurs in the context of SAP IS-U (Industry Solution for Utilities) when dealing with contracts related to utility services, such as electricity, water, or gas.
    
    Cause: The error arises when there is a mismatch between the validity period of the contract and the measurement point period. Specifically, it means that the contract does not cover the entire duration for which the measurement point is being evaluated. This can happen due to several reasons: Contract Validity Dates: The start and end dates of the contract do not align with the measurement period. Contract Changes: The contract may have been modified or terminated, leading to gaps in coverage. Incorrect Measurement Point Configuration: The measurement point may be set up incorrectly, leading to an invalid period being referenced. Data Entry Errors: There may be mistakes in entering the contract

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author