How To Fix OIUCA115 - Zero Production volume was prorated over MP contracts


OIUCA115 - Overview

  • Message type: E = Error

  • Message class: OIUCA - E&P Contract Alloaction

  • Message number: 115

  • Message text: Zero Production volume was prorated over MP contracts

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIUCA115 - Zero Production volume was prorated over MP contracts ?
    The SAP error message OIUCA115, which states "Zero Production volume was prorated over MP contracts," typically occurs in the context of the Oil and Gas industry, particularly when dealing with production volumes and contracts in the SAP Oil and Gas (SAP OIL) module. This error indicates that there is an issue with the production volume being processed, specifically that the production volume is zero, which is causing problems when prorating it over multiple contracts.
    
    Cause: Zero Production Volume: The primary cause of this error is that the production volume being processed is zero. This can happen due to various reasons, such as: No actual production occurred during the reporting period. Data entry errors where production volumes were not recorded correctly. Issues with upstream data integration where production data is not being captured or transmitted correctly. Contract Configuration: The contracts involved may not be set up to handle zero volumes appropriately, leading to issues when the system

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant