How To Fix OIUCA089 - Period Basis and Length are both required for Evergreen Contracts


OIUCA089 - Overview

  • Message type: E = Error

  • Message class: OIUCA - E&P Contract Alloaction

  • Message number: 089

  • Message text: Period Basis and Length are both required for Evergreen Contracts

  • Show details Hide details
  • What causes this issue?

    When defining an evergreen contract, the Period Basis (years, days,
    months) and the Period Length or duration of the contract, must both be
    entered. These two values are used to calculate the "Right to Cancel"
    date.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    Right to Cancel Date = Contract Valid To / Expiration Date + Period
    Basis / Period Length
    Example:
    ,,Valid To / Expiration Date = 12/31/1999
    ,,Evergreen Period Basis = DAY
    ,,Evergreen Period Basis = 255
    ,,12/31/1999 + 255 days = Right to Cancel Date of 03/12/2000

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIUCA089 - Period Basis and Length are both required for Evergreen Contracts ?
    The SAP error message OIUCA089 indicates that there is an issue with the configuration of Evergreen Contracts in the SAP system. Specifically, it points out that both the "Period Basis" and "Length" fields are required for these types of contracts. Evergreen contracts are typically agreements that automatically renew after a certain period unless one party decides to terminate the contract.
    
    Cause: The error occurs when you attempt to create or modify an Evergreen Contract without providing the necessary information in the "Period Basis" and "Length" fields. These fields are essential for defining the duration and renewal terms of the contract.
    Solution: To resolve this error, you need to ensure that both the "Period Basis" and "Length" fields are filled out correctly when creating or editing an Evergreen Contract. Here are the steps to do this: Access the Contract Creation/Modification Screen: Navigate to the screen where you are creating or modifying the Evergreen Contract. Locate the Period

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author