How To Fix OIUCA032 - Contract is not effective for entire measuremnt point period.


OIUCA032 - Overview

  • Message type: E = Error

  • Message class: OIUCA - E&P Contract Alloaction

  • Message number: 032

  • Message text: Contract is not effective for entire measuremnt point period.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIUCA032 - Contract is not effective for entire measuremnt point period. ?
    The SAP error message OIUCA032 indicates that a contract is not effective for the entire measurement point period. This typically occurs in the context of SAP's Oil and Gas (O&G) module, particularly when dealing with contracts related to measurement points for oil and gas production.
    
    Cause: Contract Validity Dates: The contract associated with the measurement point may have start and end dates that do not cover the entire period for which the measurement point is being evaluated. For example, if the measurement point is active from January 1 to December 31, but the contract is only valid from March 1 to November 30, this error will occur. Contract Status: The contract may be in a status that does not allow it to be effective, such as being in a draft state or marked as inactive. Measurement Point Configuration: There may be issues with how the measurement point is configured, including incorrect assignment of contracts

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant